Why it matters
Nutrient totals in a plan are only as good as the weights and grades actually delivered. A log also supports tax records, storage inventory and reviews by lenders or programs. Spending two minutes at the dock is cheaper than discovering a shortfall after the product is spread.
Step by step
- Record order date, supplier, product, grade, ordered weight, agreed price per ton and whether freight is included, before the truck arrives.
- At delivery, note date, driver, truck or bin, and copy the load ticket weight and grade. Compare them with the order before signing.
- If you have a scale or certified weigh ticket, record that weight too. Flag any variance beyond what your supplier agreement allows.
- When the invoice arrives, compare tons billed and price against the ticket, not the order. Query differences in writing and keep the answer.
- Convert delivered weight to pounds of nutrient, add it to a running per-field total, and update storage inventory so remaining product is known.
Worked example
Illustrative: you order 10 tons of 18-46-0 at $700 per ton. The load ticket shows 9.82 tons and the invoice bills 10.00 tons. Overbilled = 10.00 - 9.82 = 0.18 ton x $700 = $126.00. Delivered P2O5 = 9.82 x 2,000 x 0.46 = 9,034 lb, not the 9,200 lb the order implied. Without the log, the nutrient plan would be 166 lb P2O5 high. All numbers are practice figures.
Printable worksheet: delivery record
- Order date, supplier and product/grade: ____________________
- Ordered weight and agreed price per ton: ____________ / $____________
- Ticket weight and grade delivered: ____________ / ____________
- Invoice weight and amount billed: ____________ / $____________
- Variance (ticket - invoice) in tons and dollars: ____________ / $____________
- Nutrient delivered, lb = tons x 2,000 x decimal grade: ____________
- Fields assigned and storage location: ____________________
Common mistakes
- Signing the ticket without checking it against the order, which removes the easiest chance to correct a grade or weight error.
- Paying the invoice without comparing it to the ticket, so billing for undelivered tons goes unnoticed.
- Planning nutrient totals from ordered rather than delivered weight, leaving every field a little off.
Frequently asked questions
How long should I keep these records?
Keep them at least as long as your tax adviser, lender and any program you take part in require. Ask them for the period, because requirements differ and this guide does not set one.
What if the delivered grade differs from what I ordered?
Write it on the ticket, tell the supplier the same day, and photograph the label or tag. Recalculate nutrient per ton with the grade actually delivered before spreading anything.
Official sources
General planning education, not a fertilizer recommendation. Base rates on a calibrated soil test and local Cooperative Extension guidance. Find soil labs and extension resources for your state. Try the N-P-K rate and cost calculator.