FertilizerAndNutrientTool
Manure and Compost Nutrients

Manure Test Interpretation Worksheet

Manure lab reports mix percentages, ppm, dry basis and as-is columns. This worksheet walks through reading the right column, converting percent to pounds per ton, and turning the result into nutrients per acre for a planned rate.

By the FertilizerAndNutrientTool editorial team · Updated 2026-11-22

Why it matters

Most manure mistakes happen after the lab, in unit conversions. A percent read as pounds, a dry-basis figure used as wet, or P2O5 compared against a phosphorus limit can be off by a factor of two or more. A fixed worksheet makes the same checks happen every time.

Step by step

  1. Identify the basis on the report, as-is or dry, and use the as-is column for anything you spread unless the report tells you otherwise.
  2. Convert percent to pounds per ton by multiplying the percent by 20, because 1 percent of 2,000 lb is 20 lb.
  3. Convert ppm to percent by dividing by 10,000 when you need a micronutrient on the same scale as the major nutrients.
  4. Convert P2O5 to elemental P with 0.436 and K2O to K with 0.83 when your plan or soil test uses elemental values.
  5. Multiply pounds per ton by tons applied per acre, then compare each nutrient with crop removal and soil test needs from your plan.
  6. Note which nutrient is limiting in your program, often phosphorus, and write the rate it would cap before nitrogen is considered.

Worked example

Illustrative: an as-is report shows 2.0 percent N, 1.5 percent P2O5 and 1.8 percent K2O. Multiplying by 20 gives 40 lb N, 30 lb P2O5 and 36 lb K2O per ton. At 3 tons per acre the totals are 120 lb N, 90 lb P2O5 and 108 lb K2O. Converting phosphorus, 90 x 0.436 = 39.2 lb P per acre. Whether that rate fits depends on soil test and plan limits.

Printable worksheet: manure report to per-acre nutrients

  • Report date and sample ID: ______________________
  • Basis on report (as-is or dry): ______
  • N ____% x 20 = ____ lb/ton P2O5 ____% x 20 = ____ lb/ton
  • K2O ____% x 20 = ____ lb/ton Moisture: ____%
  • Planned rate: ____ tons per acre
  • N ____ x rate = ____ lb/ac P2O5 ____ x rate = ____ lb/ac
  • K2O ____ x rate = ____ lb/ac P: P2O5 ____ x 0.436 = ____ lb P/ac
  • Limiting nutrient and maximum rate it allows: ______________________

Common mistakes

  • Reading 2.0 percent as 2 lb per ton instead of 40 lb per ton, an error of twenty times.
  • Comparing P2O5 from the manure report with a limit written in elemental P without converting.
  • Using the dry-basis column for a wet manure rate, which overstates every nutrient.

Frequently asked questions

Which nutrient should set my manure rate?

It depends on your plan and local rules. Many programs limit manure by phosphorus when soil test P is high, while others use nitrogen. Check what your plan writer or extension office requires for your fields.

Are nutrients in manure fully available this year?

No. The test gives total nutrients, and only part is available the first year. Nitrogen especially needs availability factors, while phosphorus and potassium are often treated as largely available. Confirm treatment with your extension guidance.

Official sources

General planning education, not a fertilizer recommendation. Base rates on a calibrated soil test and local Cooperative Extension guidance. Find soil labs and extension resources for your state. Try the N-P-K rate and cost calculator.